Decontamination of soils and industrial plants and sites

Hazardous waste disposal

Did you know that...?
The PCB molecule is short and heavy, thus the PCB oils easily penetrate ...

The famous pesticide DDT (Dichloro-diphenyl-trichloroethane) in small concentrations can resist in the ground ...
Carbon sulphide (CS2) is a toxic substance with a density higher than that of water ...
Persistent organic pollutants (POP's) were forbidden for production and marketing because of ...

Read more »

SETCAR S.A. BRAILA - ROMANIA

AUTOMOBILE DACIA S.A.

Main projects - Automobile Dacia S.A.

Starting with 2006, SETCAR is a partner of AUTOMOBILE DACIA S.A. for solving some most various environment problems. Even the diversity of waste types collected and disposed (various sludge, acid solutions, PCB oil electrical equipment, sludge and paint waste, discarded chemicals, antifreeze, grease, liquid and solid petroleum waste etc.) as well as the diversity of decontamination works performed, makes difficult the choice of a single representative work.
This si why we chose to present 2 reference projects:

Decontamination of segment chrome plating section, collection, repackaging, transport and disposal of chrome containing waste, installations decommissioning. The project was performed within January – March 2006 and involved the following activities:
  • extraction of chrome anhydride waste from tanks, installations and ventilation system;
  • primary decontamination of installations, tanks and ventilation system;
  • demounting of fine material which could not be decontaminated on site (pipes, fittings, pumps etc.); transport to Neutralization premises of Setcar for dismemberment and decontamination;
  • sorting on categories and recovery of decontaminated metal waste;
  • section decontamination (technological network, concrete surfaces etc.);
  • packaging, labelling, authorized transport, temporary storage and disposal of waste resulted from decontamination;
  • handing over to the beneficiary of chrome plating section, free of environment tasks.

Total quantity of chrome containing waste taken, transported, temporarily stored and disposed was over 300 tons.

Decontamination of Transmission Workshop, waste collection, repackaging, transport and disposal, installation decommissioning. The project was performed in stages, within 2010 – 2011 and involved the following activities:
  • taking over, packaging, labelling, authorized transport, temporary storage and disposal of chrome, phosphate and zinc plating lines waste;
  • extraction and treatment of aqueous liquids from decanters and filter beds in the basement;
  • taking over, packaging, labelling, authorized transport, temporary storage and disposal of sludge, soil and stones from decanters and filter beds from the basement, namely from outside the Transmission Workshop;
  • decontamination of chrome, phosphate, zinc plating lines;
  • decontamination of basement installations (decanter, filter beds etc.) and above ground installations outside the Transmission Workshop (aboveground decanter, drying beds);
  • dismantling of installations, sorting on categories and recovery of decontaminated metal waste;
  • handing over to the beneficiary of the Transmission Workshop, free of environment tasks.

Total quantity of waste taken, treated, transported, temporarily stored and disposed was over 2,100 tons.