Decontamination of soils and industrial plants and sites

Hazardous waste disposal

Did you know that...?
The PCB molecule is short and heavy, thus the PCB oils easily penetrate ...

The famous pesticide DDT (Dichloro-diphenyl-trichloroethane) in small concentrations can resist in the ground ...
Carbon sulphide (CS2) is a toxic substance with a density higher than that of water ...
Persistent organic pollutants (POP's) were forbidden for production and marketing because of ...

Read more »

SETCAR S.A. BRAILA - ROMANIA

CRANGURILE - ROMANIA

Main projects - Crangurile - Romania

Project: „Rehabilitation of historically polluted site – location: Former Chemical Factory (Village Crangurile)”

Beneficiary: Local Council Crangurile, Village Crangurile, Dambovita County, Romania


The project was performed within 2012 – 2013 and involved the following activities:
  • Additional activities;
  • Design: Technical Project elaboration and execution details, elaboration of documentations to get approvals/permits;
  • Site organization and connection to utilities;
  • Waste and vegetation disposal from land surface, demolition of ruins;
  • Excavation of first meter of contaminated soil and mounds from entire site (abt. 20,000 m²), soil sorting and washing (abt. 21,000 m³) and removal of residues from soil washing (abt. 4,200 m³);
  • Stabilization/solidification of about 40,000 m3 contaminated soil from an area of about 8,000 m²;
  • Treated soil refilling/compaction;
  • Import of filling soil – 1,200 m³ and top soil – abt. 3,000 m³;
  • Installation of 18 ground water monitoring wells.

Quantities of processed waste:
  • Demolition of platforms and building ruins, clearing vegetation, hazardous and non-hazardous waste packaging and transport to authorized recovery and disposal facilities – 154 tons of non-hazardous waste and 89 tons of hazardous waste (including treatment and disposal of vials and arsenic containing waste);
  • Excavation of 63,875 m³ contaminated soil;
  • Treatment by sorting and washing of 22,474 m³ chrome contaminated soil (hexavalent and trivalent), Arsenic, Lead, heavy metals and chemical waste;
  • Removal and treatment of 4.488 m³ contaminated sludge/cakes resulted from washing operation;
  • Treatment by stabilization/solidification of 41,475 m³ chrome contaminated soil (hexavalent and trivalent), Arsenic, Lead, heavy metals and chemical waste by using additives and binders for the conversion of soluble compounds into insoluble compounds, resulting in a volume of 57,167 m³ of stabilized material;
  • Import of filling soil – 1,200 m³ and top soil – abt. 3,000 m³;
  • Refilling and compaction of treated and filling soil: 76,318 m³;
  • Distribution of topsoil and grassing a surface of 20,000 m² using 1.5 tons of seeds.

Photo gallery »